Rail Coach Factory Tenders — Updated July 2026
Latest Rail Coach Factory Tenders — Updated Daily
GeMTech PARAS helps vendors tap into Rail Coach Factory tenders with full GeM railway tenders access, e-tender solutions, and filing support. Whether you deal in coach components, fabrication, painting, or supply chain logistics, we ensure you're properly registered and fully compliant. Our platform simplifies participation in coach manufacturing tenders and govt etender filings with real-time updates, bid alerts, and expert GeM support. We help vendors become competitive players in the expanding Indian railway production ecosystem.
Read More
Rail Coach Factory Tenders Overview
245
Rail Coach Factory Tenders Tracked
354+
Clients Across India
4.9★
Google Rating
24hr
Response Turnaround
98%
Compliance Rate
Showing 1 to 25 of 245
for Rail Coach Factory Tenders
Rail Coach Factory
1 day left
Supply Of Set Of End Part (driving & Non-driving End ) For 3phase Memu/dmc [note:- For Details Of Free Supply Items & Loose Items Please See Annexure 'c' Ver 04], As Per Drawing:mp18endpt3phdmc Version 8, Packing Instruction: Pi100 Ver1.0. [ Warranty Period: 84 Months After The Date Of Delivery ] ]
End Date
13 Jul 2026 12:00 PM
1 day left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
2 days left
Supply Of Front Part(schedule Of Infrastructural Requirements To Mdts21261 Rev-03 Dated 09.06.2020) To Be Masked As Per Drg. No Mi005396 Alt.'h' For Lhb Type Coach. Note:- (1) Protection Procedure As Per Dy Cple-iii Annexure-app Dated 14/05/2024. (2) Dimensions As Per Dy Cple -iii Annexure-ufp Dated 15/05/2024., As Per Drawing: Mp13uframebio Version 6,packing Instruction: Pi100 Ver1.0. [ Warranty Period: 84 Months After The Date Of Delivery ] ]
End Date
14 Jul 2026 12:00 PM
2 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
1 day left
Supply Of Body Side Sliding Door (set Consists Of Door Leaf Rh & Lh 01 No Each As Per Drg). (note : List Of Accessories Of Sliding Doors For Memu Coaches To Be Procureed Without Paint/primer As Per Annexture-a By Dy Cple-iii Letter No-rcf-plg/mpsh/mp510001 Dated 05/05/2026.) , As Per Drawing: Dmu/tc/v/ss-5-8-001 Alt 'c' Col I, Packing Instruction: (1) The Transportation Arrangement Should Be As Per Drawing No Icf/j&t/sk-1866 Alt. `nil?. (2) A List Should Be Pasted Showing Interior Color Scheme, Purchase Order No., Pl No., Description Of Item, Drg. No./spec. No. , Order Quantity, Firm's Name, Address And Date Of Dispatch. Etc. (3) Transit Damage (if Any) Shall Be At The Cost Of Supplier. [ Warranty Period: 84 Months After The Dateof Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
13 Jul 2026 12:00 PM
1 day left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
1 day left
Supply Of Set Of Cage Clamp Terminals For Lhb Lscn Non Ac Coaches (with Centralisedfdb's), As Per Drawing: Edml 240, Rev- Nil, Table - 2, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
13 Jul 2026 12:00 PM
1 day left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Set Of Led Saloon Light Fitting - Indirect (with Ballast And Diffusers ) For 16- Car Vande Bharat Trainsets ( Chair Car ) With M/s Alstom Electrics., As Per Drawing: Edml239, Packing Instruction: Light Fittings:- Each Fitting To Be Wrapped With Biodegradable Plastic Bubble Sheet And Packed In A Card Board Boxes( Single Ply Corrugated). Finally Upto 24 Lights To Be Packed In A Card Board Box ( Double Ply Corrugated ) And Tied With 3packing Strips Horizontally And 3 Vertically. Detachable Diffuser If Applicable With Light Fitting As Per Drg/spec Shall Be Supplied In Separate Packing With Each Diffuser Wrapped With Biodegradable Plastic Bubble Sheet And Packed In A Card Board Boxes( Double Ply Corrugated)and Tied With 3 Packing Strips Horizontally And 3 Vertically. Quantity Of Diffusers In A Box Shall Be Matching With The No. Of Corrosponding Light Fitting In Each Box. The Material Used For Product Packaging Shall Be Eco-friendly. A List Should Bepasted On Each Box Showing Order No ,pl No, Description Of The Item, Drg.no/spec.no, Qty,firm's Name & Address And Date Of Despatch Etc. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
15 Jul 2026 12:00 PM
3 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Emergency Wider Window For Lhb Scn Coaches (size 1460 X 700, With Sliding Shutters), As Per Drawing: Mi008130 Alt B. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
17 Jul 2026 12:00 PM
5 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply And Installation Of Bio-digester System Rh For Fac (wjc) Bangladesh Railways. Note: Safety Clause Must Be Followed According To Annexure-a Of Dy.cple-ii L.no.rcf/emp/1 Dated. 01.04.2025, As Per Drawing: Bae63768 Alt Nil(mirror Of Bae63769 Alt B), Installation & Commissioning :inclusive, Packing Instruction No. Pi100 Ver1.0. [ Warranty Period: 84 Months After The Date Of Delivery ] ]
End Date
15 Jul 2026 12:00 PM
3 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Front Part(schedule Of Infrastructural Requirements To Mdts21261 Rev-03 Dated 09.06.2020) To Be Masked As Per Drg. No Mi005396 Alt.'h' For Lhb Type Coach. Note:- (1) Protection Procedure As Per Dy Cple-iii Annexure-app Dated 14/05/2024. (2) Dimensions As Per Dy Cple -iii Annexure-ufp Dated 15/05/2024. , As Per Drawing: Lp11105 Alt. 'a', Packing Instruction: Pi100 Ver1.0. [ Warranty Period: 84 Months After The Date Of Delivery ] ]
End Date
20 Jul 2026 12:00 PM
8 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Front Part(schedule Of Infrastructural Requirements To Mdts21261 Rev-03 Dated 09.06.2020) To Be Masked As Per Drg. No Mi005396 Alt.'h' For Lhb Type Coach. Note:- (1) Protection Procedure As Per Dy Cple-iii Annexure-app Dated 14/05/2024. (2) Dimensions As Per Dy Cple -iii Annexure-ufp Dated 15/05/2024., As Per Drawing: Le11166 Alt 'a', Packing Instruction: Pi100 Ver1.0. [ Warranty Period: 84 Months After The Date Of Delivery ] ]
End Date
20 Jul 2026 12:00 PM
8 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Schaku Semi Permanent Coupler End-b With Centering Device To Rdso Specification 61-b-36-rev.68.1 , As Per Drawing: 40-587 A(o) & 40-1000-10 Without Bearing Bracket &lower/upper Bush To Drg.no. 40-588-07(2) Item No. 3,4 & 10 Or Drawings Approved By Rdso, Packing Instruction: Wooden Box, Proction Procedure: Wi100110, Quality Plan: N.a. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
16 Jul 2026 12:00 PM
4 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Set Of Side Buffer Assly.(helical Spring Type) (lh&rh) For Lhb Coach, As Per Drawing: Mpmobuferlhb Version 3, Packing Instruction: Set Of Side Buffer Assly. (helical Spring Type) (lh&rh) For Lhb Coach 1. The Packing Fixture/frame To Be Fabricated Having Sufficient Strength To Bear Approximate Weight Of Eight Nos. Of Side Buffer Assly. (helical Spring Type, Lh&rh). 2. The Supplier Shall Pack The Set Of Side Buffer Assly. (helical Springtype, Lh&rh) In Such A Way That This Set Should Not Get Scratched, Damaged, Twisted During Transportation, Storage And Lifting. To Avoid Scratches On Outer Surface, It Should Be Wrapped With Environment Friendly Material. 3. The Fixture/frame/pallet Should Be Designed So That The Packed Side Buffer Assly. (helical Spring Type, Lh&rh) Remains Preferably In Vertical Condition To Minimize Surface Area. 4. First Returnable Pallet Along With Set Of Side Buffer Assly. (helical Spring Type, Lh&rh) Will Be Retained By Rcf & This Pallet Shall Be Exchanged In The Next Lots Of Supply. 5. It Should Be Suitable For Storage Of Side Buffer Assly. (helical Spring Type, Lh&rh) Under Open Sky. Firm's Identificationmark Should Be On The Packing Fixture/frame. Along With Complete Details Of Items I.e Description & Drg. No. And Plnos. , Quality Plan: N.a. [ Warranty Period: 36 Months After The Date Of Delivery ] ]
End Date
21 Jul 2026 12:00 PM
9 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Lavatory Window With Fixed Louvers And Sealed Glass Unit For Lhbcoaches, As Per Drawing: Lw54188 Alt A And Follow Design Office L.no. Md35131 Dated 26/12/2022. Packing Instruction : Pi168 Ver 4.0 Or Pi193 Ver.1.0. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
20 Jul 2026 12:00 PM
8 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Body Side Window Arrangement With Fixed Louvre Shutter, As Per Drawing: Icf/mrvc/c/bt-5-4-002 Col- I, Packing Instruction: Pi113 Version 2.0. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
20 Jul 2026 12:00 PM
8 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Set Of Pillar Assembly For 3 Phase Memu/tc Coach, As Per Drawing: Mpmemut3pl Version 2, Packing Instruction: Sub Set Packed And Tied With Steel Wire [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
20 Jul 2026 12:00 PM
8 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Set Of Partition Frame For Lsdd Amrit Bharat 3.0 ( (note- Colour Scheme Is As Per Design Letter No Md48161 Dated- 15/05/2026 ), As Per Drawing: Mp26pfgsab3.0 Version 0, Packing Instruction: `packing Condition Of Set Of Partition Frame And Procedure To Achieve Best Possible Protection During Transportation: 1. Surface Preparation: - Thoroughly Clean The Components To Remove Any Dirt, Grease Or Contaminants - Apply A Protective Film, Such As Pvc Or Laser Film Or Bubble Sheet, To Shield Surfaces From Scratches And Environmental Factor. 2. Packing Materials: - Wooden Crates: Construct Sturdy Wooden Cage Tailored To The Component's Dimensions. - Steel Strapping: Utilize Rust-proof Steel Straps To Securely Bundle Components, Preventing Movement During Transit. 3. Moisture Barrier: - Incorporate Moisture-proof Materials, Such As Plastic Film Or Water Proof Ability Paper, To Guard Against Corrosion. 4. Component Arrangement: - Place Components On Wooden Pallets Or Within Custom-designed Supports To Distribute Weight Evenly And Prevent Deformation. - Ensure That No Part Of The Component Extends Beyond The Protective Packaging To Avoid Exposure To Potential Damage. 5. Securing The Components: - Use Steel Straps Or Ropes To Fimly Anchor The Components Within The Wooden Crate, Minimizing Internal Movement. - For Added Stability, Employ Bracing Or Cushioning Materials, Such As Foam Pads Or Corrugated Inserts, To Fill Voids And Absorb Shocks. - Hardware Items To Be Suitably Packed Separately Inside The Crate. 6. Labeling And Documentation: - Clearly Label Each Package With Essential Information, Including Pl No. Specifications, Details Of Each Set With Qty. And Also Keep One Copy Inside Ot The Crate, Weight, Handling Instructions And Firm's & Destination Details. 7. Loading Onto Trailer/lorry/truck/transport: - Strategically Position The Packaged Components Within The Truck/suitable To Maintain Balance And Prevent Shifting During Transit.
End Date
20 Jul 2026 12:00 PM
8 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Set Of Final Roof Element For Ac 3 Tier Amrit Bharat 3.0 With Flat Roof Coaches, As Per Drawing: Mp26freab3tf Version 0, Packing Instruction: 1. The Supplier Shall Pack The Final Roof Element In A Suitably Designed Returnable Fixture In Such A Way Thatfinal Roof Element Shall Not Get Scratched, Damaged, Twisted During Transportation, Storage And Lifting And To Avoid Scratches On Outer Surface. It Should Be Wrapped With Enviroment Friendly Material And It Should Have Standard Clamping /fastening Mechanism So That It Can Be Opened Easily. It Should Have Firm's Identification Mark. 2. First Returanable Fixture Along With Final Roof Element Be Retained By Rcf & This Fixture Shall Be Exchanged In The Second Lot Supply And So On. At The End Of The Contact, The Firm Shall Collect The Remaining Returnable Packing Fixture From Rcf. 3. The Packing Fixture/frame To Be Fabricated Having Sufficient Strenght To Bear Approximate 1 Tonne Load In Static & Moving Condition Of Five Coach Set Of Final Roof Element. 4. The Fixture /frame/pallet Should Be Designed So That The Packed Final Roof Element Preferably Remain In Horizontal Position To Minimize Surface Area. 5. It Should Also Be Suitable For Storage Of Final Roof Element Under Open Sky. [ Warranty Period: 30 Months After The Date Of Delivery ]]
End Date
20 Jul 2026 12:00 PM
8 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of End Wall Complete Npp End For Power Car Amrit Bharat 3.0 Coaches, As Per Drawing: 83115002, Packing Instruction: Pi187ver2.0. [ Warranty Period: 84 Months After The Date Ofdelivery ] ]
End Date
20 Jul 2026 12:00 PM
8 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Set Of Air Duct (without Air Filters) For 3-phase Memu/dmc With Medha Electtic Coaches, As Per Drawing: Mpladmemu3ph Version 3, Packing Instruction No.pi042 Ver1.0 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
23 Jul 2026 12:00 PM
11 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Foot Step Arrangement For Memu/tc 3-phase Coaches, As Per Drawing: Et24100alt A Item 1, Packing Instruction No.pi100 Ver1.0. [ Warranty Period: 30 Months After The Dateof Delivery ] ]
End Date
23 Jul 2026 12:00 PM
11 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
2 days left
Supply Of Hose Coupling, As Per Drawing: Cc63277 Alt A, Packing Instruction: Suitably Packed In Jute Bags, Quality Plan: N.a. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
14 Jul 2026 12:00 PM
2 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply And Installation Of One Coach Set Of Entrance Hand Rail For Train Set Dtc Coaches, As Per Drawing: Train18/dtc/ac-6-4-001 Alt Er Col - Iii, Packing Instruction: Pi018 Ver1.0, Biodegradable Packaging. Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
28 Jul 2026 12:00 PM
16 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Consultancy And Providing Comprehensive Detailed Design, Drawings For Up Gradation Of Existing Sewerage Treatment Plants Of Capacities 7.0 Mld And 3.75 Mld In Rcf, Kapurthala.
End Date
15 Jul 2026 12:00 PM
3 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Set Of Side Wall Assly And Roof Complete For Lhb Power Car. Note:-in Drawings "mig Welding (131) Is To Be Read As Tig Welding (141)" As Per Design Letter No. Md46231 Dated 16.03.2024. , As Per Drawing: Mp24swpc Version 3 & Mdts21323 Rev-04 (roof Assly) & Mdts21327 Rev-03 (side Wall) Dated 01/05/2024. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
20 Jul 2026 12:00 PM
8 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Set Of Partition Frames For Driving Trailor Car (dtc) T18 Coaches , As Per Drawing: Mp22pfdtct18 Version 7, Packing Instruction: Wooden Cage [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
22 Jul 2026 12:00 PM
10 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Electrification Arrangement For Extension Of Cmt Lab With Electrification Arrangement As Per Purposed Lay Out.
End Date
17 Jul 2026 12:00 PM
5 days left
Location
Multi City, Multi State
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Select a tender to view details
The Problem
Why Rail Coach Factory Tenders Get Rejected at the Technical Stage
These are the most common rejection reasons our team sees — all 100% avoidable with the right support.
Documentation Errors
Incorrect formats or missing mandatory certificates often lead to rejection.
Submission Delays
Waiting until the last minute often leads to technical glitches & failure.
The Solution
Everything You Need to Win Rail Coach Factory Tenders — In One Platform
End-to-end bid support from documentation to order confirmation.
Documentation Support
We prepare your complete technical & financial bid folders — rejection-proof.
- EMD / Bank Guarantee preparation
- QR certificate compilation & verification
- MAF & OEM authorization letters
Portal Management
End-to-end bid submission so you never miss a deadline.
- Bid submission on portal
- Document upload & correct tagging
- Deadline alerts & reminders
Post-Bid Support
We stay with you from submission to order confirmation.
- Technical Query (TQ) response
- Evaluation stage liaisoning
- LOI / Work Order follow-up
Our Process
How It Works — 4 Simple Steps
1
Eligibility Check
WhatsApp company profile, AI checks QR fit within 2 hours
2
Document Review
we audit existing documents against tender requirements
3
Bid Preparation
we prepare all technical & financial folders, 100% compliant
4
Submit & Win
submission supported through evaluation
FREE DOWNLOAD
Rail Coach Factory Tender Checklist:
10 Must-Have Documents
10 Must-Have Documents
The exact checklist our team uses for every Rail Coach Factory bid — never get
rejected for a missing document.
FAQ
Frequently Asked Questions about Rail Coach Factory Bidding
Chat with a Rail Coach Factory tender Expert