We are not affiliated with, endorsed by, authorised by, or otherwise connected in any manner whatsoever with the Government e-Marketplace (GeM) or the Government of India. We provide independent advisory and consultancy services only and do not act as or represent ourselves as agents, representatives of any government authority or government entity or government company.

🔴  3 South Western Railway tenders closing in under 3 days — review & act now —  Review & act now
South Western Railway Tenders — Updated July 2026

Latest South Western Railway Tenders — Updated Daily

GeMTech PARAS gives vendors a strategic edge with access to South Western Railway tenders across Karnataka and neighboring regions. From SWR eTenders to Western Railway notices, our portal aggregates railway tender opportunities including procurement, maintenance, and infrastructure projects under one simplified platform.
Read More

Tender Labs aggregates live South Western Railway tenders in one searchable platform. Every active tender is indexed, filtered, and matched to your company profile automatically. Stop manually checking portals — let the data come to you.

810
South Western Railway Tenders Tracked
363+
Clients Across India
4.9
Google Rating
24hr
Response Turnaround
98%
Compliance Rate

    South Western Railway
    Showing 1 to 25 of 810 for South Western Railway Tenders
    South Western Railway
    Corrigendum : Supply Of Double Sealed Window Glass Unit For Lhb Coaches Fixed Window To Rcf Drg No. Lw 54104 Alt I, To Size 1117(+/-1) X 697(+/-1)x18.38 Mm, With Outer Glass Safety Laminated Float Glass With Pvb Film And Inner Glass Of Toughened As Per Mdts-089 Rev-4 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted:max 8 Lacs ] ]
    End Date 29 Jul 2026 12:00 PM 20 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Corrigendum : Supply Of Adapter (narrow Jaw) Class 'e' 6x11 To Rdso Drawing No. Wd-89067-s-9, Alt-11. To Rdso Specification No Ab/rb-39-2002 (rev.-4) Of February-2018 [ Warranty Period: 30 Monthsafter The Date Of Delivery ]
    End Date 13 Jul 2026 12:00 PM 4 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Corrigendum : Supply And Installation Of Electropneumatic Pressurized Flushing System For Lhb Coaches To Mcf Specn.mmdts-19027-rev-3. Or Latest. Note: Installation To Be Done As Per The Latest Cai Issued By Rdso. Lt.no. Mc/cb/lf/anaerobic Dated 07-10-2024 [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 20 Jul 2026 12:00 PM 11 days left
    Location Mysore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Corrigendum : Supply And Installation Of One Coach Set Of Seats And Berth Complete(hl3) For Lwscwac/eog Coaches To Drg. No. Lwscwac/eog-6-1-001,alt- J, Col-i. (except Item13) With Upholstery Colour Alnac-03. Cushioning Material Shall Be Pu Foam As Per Rdso Specification No.rdso/2007/cg04, Rev-01 Or Latest And Upholstery To Rdso Spec.rdso/2008/cg-07 Rev-01 Or Latest. For Thickness Of Cushion Refer Drawing 593-6-1-042,alt-e. Installation Required As Per Arrangement Drawing. All Necessary Hardwares Required For Installation Is Under Scope Of The Supplier. Note: Firm Has The Option For Offering Seats And Berths Cushion With Lower Density Of 65 Plus Or Minus 5 Kg/m3 Conforming To Spec.rdso/2007/cg-04, Rev-01 Or Latest Also. [ Warranty Period: 120 Months After The Date Of Delivery ] ]
    End Date 03 Aug 2026 12:00 PM 25 days left
    Location Mysore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Supply Of Adapter (narrow Jaw) Class 'e' 6x11 To Rdso Drawing No. Wd-89067-s-9, Alt-11. To Rdso Specification No Ab/rb-39-2002 (rev.-4) Of February-2018 [ Warranty Period: 30 Monthsafter The Date Of Delivery ] ]
    End Date 13 Jul 2026 12:00 PM 4 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Supply Of Double Sealed Window Glass Unit For Lhb Coaches Fixed Window To Rcf Drg No. Lw 54104 Alt I, To Size 1117(+/-1) X 697(+/-1)x18.38 Mm, With Outer Glass Safety Laminated Float Glass With Pvb Film And Inner Glass Of Toughened As Per Mdts-089 Rev-4 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted:max 8 Lacs ] ]
    End Date 29 Jul 2026 12:00 PM 20 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Supply And Installation Of One Coach Set Of Seats And Berth For Lwaccn Coaches To Drg.no. 645-6-1-001, Alt-a, Except Item-36, With Upholstery Colour Alnac-03. Cushioning Material Shall Pu Foam As Per Rdso Specification No.rdso/2007/cg-04, Rev-01 Or Latest And Upholstery To Rdso Spec.rdso/2008/cg-07 Rev-01 Or Latest. For Thickness Of Cushion Refer Drawing Lwaccn/eog-6-1-034,alt-b. Installation Required As Per Arrangement Drawing. All Necessary Hardwares Required For Installation Is Under Scope Of The Supplier. Note: Firm Has The Option For Offering Seats And Berths Cushion With Lower Density Of 65 Plus Or Minus 5 Kg/m3 Conforming To Spec.rdso/2007/cg-04, Rev-01 Or Latest Also. [ Warranty Period: 120 Months After The Date Of Delivery ] ]
    End Date 23 Jul 2026 12:00 PM 14 days left
    Location Mysore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Supply Of Brake Beam 16t Complete For Bg Coaches To Icf Drg No. T-3-2-624 Alt. P/7 Col.iv Except Bush To Item No.6. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted:max 8 Lacs ] ]
    End Date 10 Aug 2026 12:00 PM 32 days left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Supply Of One Coach Set Of (1) Control Arm Lower Right To Icf Drg No. Aaa02028 Alt'd' - 4 Nos (2) Control Arm Lower Left To Icf Drg No. Aaa02027 Alt'd' - 4 Nos (3) Contorl Arm Upper To Icf Drg No. Aaa02026 Alt'j' - 8 Nos (three Items Form One Set). Special Condition: Infrastructure Requirements Shall Be As Per Mdts-241 Rev.02. [ Warranty Period: 30 Months After The Dateof Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted:max 8 Lacs ] ]
    End Date 17 Aug 2026 12:00 PM 39 days left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Design, Supply, Erection, Testing, Commissioning Of 2x25 Kv Ohe , Psi System (tss's , Sp's & Ssp's) , Transmission Line Provision From Gss To Tss , Electrical General Works , Engineering Works And Signalling & Telecommunication Works Of Ginigera And Raichur Section (166 Rkm/204 Tkm)
    End Date 25 Jul 2026 12:00 PM 16 days left
    Location Raichur, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    1 day left
    Corrigendum : Design, Supply, Erection, Testing, Commissioning Of 2x25 Kv Ohe , Psi System (tss's , Sp's & Ssp's) , Transmission Line Provision From Gss To Tss , Electrical General Works , Engineering Works And Signalling & Telecommunication Works Of Ginigera And Raichur Section (166 Rkm/204 Tkm)
    End Date 10 Jul 2026 12:00 PM 1 day left
    Location Raichur, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Corrigendum : Supply Of Modular Bipolar Hip Prosthesis Set Consisting Of Femoral Stem-01, Titanium Alloy Make, Proximal Stem H A Coated , Morphometric Wedge Design Which Fits For A Wide Range Of Femoral Canal And To Have Two Neck Angles, 02- Femoral Head Cobalt Chromium-1no. 03-bipolar Component Cobalt With Highly Cross Lined Poly Lining ]
    End Date 09 Dec 2026 12:00 PM 153 days left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    13 hours left
    Corrigendum : Supply, Testing & Commissioning Of 21.6/30.24 Mva, 110kv/27kv, 50hz, Single Phase,onan/onaf Type Traction Power Transformer Along With All Accessories Required For Its Commissioning As Per Packing List And As Per Rdsos Specification No. Ti/spc/psi/trnpwr/3201 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 09 Jul 2026 12:00 PM 13 hours left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    13 hours left
    Supply Of 160 Sq.mm. Annealed Copper Stranded Jumper Wires As Per Rdso Spec: Ti/spc/ohe/jmp/0941 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 09 Jul 2026 12:00 PM 13 hours left
    Location Hosur, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Den/west/sbc Sec : Ksr Bengaluru : Proposed Construction Of Boundary Wall In And Around Sbc Area For A Length Of 1500 Mtr.(2m Height Rr Masonry And 1m Fencing, Total 3m Height) Maintenance Period Is 12 Months
    End Date 14 Jul 2026 12:00 PM 5 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    1 day left
    Hubballi Division:- Cleaning Of Pvc Tanks, Glrs And Ohts Under Aden/hq/ubl Jurisdiction For One Year.
    End Date 10 Jul 2026 12:00 PM 1 day left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    13 hours left
    Hubballi Division: Ld-mrj :collection Of Hydro Metrological Data During And After Monsoon For 2 Years (2026-27 And 2027-28) At 1)br.no.44 @ Km 583/700-900 Of Span 10 X 6.10m + 3x 9.10m Between Gnj-knp(gunji - Kanapur) And 2) Br.no.184 @ Km 716/00-900 Of Span 14 X 45.72m Between Kud-ugr (kuduchi-ugarkhurd) In Ld-mrj Section.
    End Date 09 Jul 2026 12:00 PM 13 hours left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    1 day left
    Hubballi Division: Hebsur: Provision Of 02 Additional Loop Lines.(maintenance Period-12 Months)
    End Date 10 Jul 2026 12:00 PM 1 day left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    1 day left
    Hubballi Division-provision Of Tactile Path In Stations Under Sr.den/hq Jurisdiction (maintenance Period-12 Months).
    End Date 10 Jul 2026 12:00 PM 1 day left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Den/west/sbc Sec : Sw-i: Bengaluru (sbc) - Improvements To The Bituminous Road Surfaces In Mg Colony At Bengalurusw-ii: Proposed Provision Of Divyang Facilities Like Tactile Pathway At Pf's To Divyang Ramp, Circulating Area At Krishnadevaraya Halt (kndv), Nayandahalli(nyh), Jnana Bharati Halt(gnb), Hejjala(hjl), Bidadi(bid), Ketohalli(khll), Settihalli(set), Nidaghatta Halt(nzh), Hanakere(hnk), Maddur(mad), Yeliyur(y) Between Bengaluru - Yeliyur Section, Under Aden/mya Jurisdiction. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
    End Date 14 Jul 2026 12:00 PM 5 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Aden/mya Sub-division : Jnanabharathi - Halt (gnb - H) Stn : Proposed Extension Of Pf-1 And Pf-2 For A Length Of 95.00 Mts With 5 Mtr Width, Construction Of 1 No's Of Pay And Use Toilet Along With Divyanjan Toilet, Drinking Water Booths, Platform Shelter At Jnanabharathi-h(gnb-h) Station Between Bengaluru - Yeliyur Section, Under Aden/mya Jurisdiction. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
    End Date 14 Jul 2026 12:00 PM 5 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Aden/mya Sub-division- Proposed Construction Of Running Room At Bidadi (bid). (20 Beds). Maintenance Period Of 3 Years
    End Date 14 Jul 2026 12:00 PM 5 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    Aden/mya Sub-division: Construction Of Oht (over Head Tank) Of 1.00 Lakh Litre At Maddur (mad) Station, Under Aden/mandya Jurisdiction, Including Electrical Portion. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later. (composite Tender)
    End Date 14 Jul 2026 12:00 PM 5 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    13 hours left
    Hubballi Division: Cess Ballast Collection At Bdka (bairidevarakoppa) & Nvu (navaluru) Yards.
    End Date 09 Jul 2026 12:00 PM 13 hours left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    South Western Railway
    13 hours left
    Hubballi Division: Londa-miraj(ld-mrj): Protection Work For The Bridge And Bank Due To River Flooding At Bridge No. 86,87,88,90,91 And 34 Between Km 553/400 To 557/200 And 579/200 To 579/400(maintainance-12 Months)
    End Date 09 Jul 2026 12:00 PM 13 hours left
    Location Hubli, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc

    Select a tender to view details

    The Problem

    Why South Western Railway Tenders Get Rejected at the Technical Stage

    These are the most common rejection reasons our team sees — all 100% avoidable with the right support.

    Documentation Errors
    Incorrect formats or missing mandatory certificates often lead to rejection.
    Submission Delays
    Waiting until the last minute often leads to technical glitches & failure.
    The Solution

    Everything You Need to Win South Western Railway Tenders — In One Platform

    End-to-end bid support from documentation to order confirmation.

    📁
    Documentation Support
    We prepare your complete technical & financial bid folders — rejection-proof.
    • EMD / Bank Guarantee preparation
    • QR certificate compilation & verification
    • MAF & OEM authorization letters
    💻
    Portal Management
    End-to-end bid submission so you never miss a deadline.
    • Bid submission on portal
    • Document upload & correct tagging
    • Deadline alerts & reminders
    🤝
    Post-Bid Support
    We stay with you from submission to order confirmation.
    • Technical Query (TQ) response
    • Evaluation stage liaisoning
    • LOI / Work Order follow-up
    Our Process

    How It Works — 4 Simple Steps

    1
    Eligibility Check
    WhatsApp company profile, AI checks QR fit within 2 hours
    2
    Document Review
    we audit existing documents against tender requirements
    3
    Bid Preparation
    we prepare all technical & financial folders, 100% compliant
    4
    Submit & Win
    submission supported through evaluation
    FREE DOWNLOAD
    South Western Railway Tender Checklist:
    10 Must-Have Documents
    The exact checklist our team uses for every South Western Railway bid — never get rejected for a missing document.
    FAQ

    Frequently Asked Questions about South Western Railway Bidding

    How to register as a vendor for South Western Railway?

    Submit the required registration form along with your company registration documents, GST certificate, PAN, and relevant experience certificates on the South Western Railway vendor portal. You'll also need to clear a financial assessment. Tender Labs manages the entire empanelment process — contact us for a free eligibility assessment.

    What is the EMD requirement for South Western Railway tenders?

    EMD is typically 2–3% of the estimated tender value, submitted as a Bank Guarantee (BG) from a scheduled commercial bank. The bank branch and BG format must be pre-approved. Submitting a DD or an incorrect BG format is the single most common rejection reason. The exact amount and format are always specified in the NIT — we verify this for every bid we manage.

    Chat with a South Western Railway tender Expert